REVO VM II 2cdr Off Grid Energy Storage Inverter

REVO VM II 2cdr Off Grid Energy Storage Inverter

3.5-5.5KW

Product Snapshot

  • Dimensions:400*300*115
  • Model:3.5KW/5 .5KW
  • Nominal Voltage: 230VAC
  • Frequency Range: 50Hz/60Hz

APPLICATIONS

  • Pure sine wave solar inverter
  • High PV input voltage range
  • Out power factor 1
  • Battery independent design
  • Built-in 100A MPPT solar charger
  • Battery equalization function to optimize battery performance and extend lifecycle
  • Built-in anti-dusk kit for harsh environment

12V 24v LiFeP04 Deep Cycle Battery

MODEL REVO VM II 3500-24 REVO VM II 5500-48
Rated Power 3500VA / 3500W 5500VA / 5500W
INPUT
Voltage 230 VAC
Selectable Voltage Range 170-280 VAC (For Personal Computers) ; 90-280 VAC (For Home Appliances)
Frequency Range 50 Hz/60 Hz (Auto sensing)
OUTPUT
AC Voltage Regulation(Batt. Mode) 230VAC ± 5%
Surge Power 7000VA 11000VA
Efficiency (Peak) up tp 93.5%
Transfer Time 10 ms  (For Personal Computers) ; 20 ms (For Home Appliances)
Waveform Pure sine wave
BATTERY
Battery Voltage 24 VDC 48 VDC
Floating Charge Voltage 27 VDC 54 VDC
Overcharge Protection 33 VDC 63 VDC
SOLAR CHARGER & AC CHARGER
Maximum PV Array Open Circuit Voltage 500 VDC 500 VDC
Maximum PV Array Power 4500 W 5500 W
MPPT Range @ Operating Voltage 120~450 VDC 120~450 VDC
Maximum Solar Charge Current 100 A 100 A
Maximum AC Charge Current 80 A 80 A
Maximum Charge Current 100 A 100 A
PHYSICAL
Dimension, D x W x H (mm) 400 x 300 x 115 400 x 302 x 120
Net Weight (kgs) 8.5 10
Communication Interface USB/RS232
ENVIRONMENT
Humidity 5% to 95% Relative Humidity (Non-condensing)
Operating Temperature -10°C to 50°C
Storage Temperature -15°C to 60°C

Installation

Tools:

Multi meter, Ampere meter, Insulated gloves, Screw driver, Cold press terminal plier, Other installation tools

Note:

  1. All wiring must be well-fastened to avoid
  2. Make sure that the polarity of PV and batteries connected to the product is
  3. Should install utility, battery and PV input breaker to ensure
  4. It is forbidden for inverter to share the same solar panel
  5. Battery and solar panel connections must be within the parameters of the
  6. Should install SPD on utility and PV input to protect the
  7. During the operation of the system, do not disconnect the
  8. In areas with large dust, regular cleaning is required to avoid too much dust affecting heat
  9. Inverter protection degree is
Scroll to Top